Main Article Content

Abstract

An Indonesian airline, PT. XYZ, performs maintenance on its Boeing 777 aircraft equipped with General Electric GE90 engines at PT. GMF AeroAsia. The aircraft’s Engine Air Supply System utilizes a High Pressure Shutoff Valve (HPSOV) and a Pressure Regulating Shutoff Valve (PRSOV). Between 2019 and 2022, PT. XYZ's Boeing 777 fleet experienced 10 delays and 52 instances of HPSOV/PRSOV replacements due to valve sticking or seizing. This study aims to analyze the reliability of the HPSOV/PRSOV by calculating the Mean Time Between Failures (MTBF) and to optimize spare parts inventory management using the Economic Order Quantity (EOQ) method. The MTBF calculation yielded a value of 8,134.08 Flight Hours (FH). Additionally, the spare parts inventory analysis indicated that the most economical order quantity for each repair is 2 units, with a remaining inventory of 2 units. The total cost of the spare parts inventory is $3,033.66 USD. The findings of this study are expected to provide recommendations for PT. XYZ to improve spare parts inventory management and minimize the risk of delays in aircraft maintenance.


 


 

Keywords

Boeing 777 High pressure Shutoff Valve (HPSOV) Pressure Regulating Shutoff Valve (PRSOV) Economic Order Quantity (EOQ)

Article Details

How to Cite
Herbert Triyogi, Mufti Arifiin, & Aprilia Sakti K. (2024). Perhitungan Spare Part HPSOV / PRSOV Pesawat Boeing 777 Dengan Metode Economic Order Quantity. Jurnal Teknologi Kedirgantaraan, 9(2), 97-107. https://doi.org/10.35894/jtk.v9i2.186

References

  1. P. Andrew,Hydraulics and Pneumatics: A Technician's and Engineer's Guide,Jakarta: Erlangga,2003.
  2. GMF AeroAsia,Basic Aircraft Maintenance Training Manual – Module 10.2 Pneumatic,Jakarta: PT Garuda Maintenance Facility Aero Asia,2018.
  3. Honeywell International Inc.,Component Maintenance Manual- Pressure Regulating Shut Off Valve S/N 5357 P/N 3215302-5,Jakarta: PT Garuda Maintenance Facility Aero Asia,2018.
  4. Kementrian Perhubungan (DKPPU),CASR Part 1 Definition and Abbreviations Amd 1,Peraturan Menteri Perhubungan,Indonesia,2006.
  5. Garuda Indonesia Maintenance Program,Doc. No MZ-TD-04-777-300ER Rev. 10,Jakarta: 2021.
  6. Boeing Co.,Minimum Equipment List Rev 21,2018.
  7. SAP SWIFT GMF AeroAsia,"SAP Adalah: Pengertian,Contoh hingga Cara Kerjanya," Akseleran Blog,2023.
  8. IATA,"Standard IATA Delay Codes (AHM730)," 2022. [Online]. Available: https://ansperformance.eu/library/iata-delay-codes.pdf. [Accessed: 25-Nov-2022].
  9. V. A. T. Manurung, Ilmu Material untuk Otomotif,Jakarta: Politeknik Manufaktur Astra,2016.
  10. J. Wiksten, Maintenance and Reliability,Lulea: Lulea University of Technology,2006.
  11. D. R. Abernethy, The New Weibull Handbook,North Palm Beach,2015.
  12. D. K. Sofyan,C. Chalirafi,and M. Sayuti, Perancangan Tata Letak Ulang Pabrik: Berdasarkan Perhitungan Persediaan Bahan Baku dengan Metode Economic Order Quantity (EOQ),Yogyakarta: TEKNOSAIN,2019.
  13. C. Yuliana,"Penerapan Model EOQ (Economic Order Quantity) dalam Rangka Meminimumkan Biaya Persediaan Bahan Baku," 2016.
  14. Engineering PT GMF AeroAsia,"Data Swift SAP GMF AeroAsia," [Online]. Available: http://psgsucm.gmf-aeroasia.co.id:8319. [Accessed: 12-Jan-2023].
  15. PT GMF AeroAsia,Maintenance Document,[Online]. Available: https://dashboard-Reliability.gmf-aeroasia.co.id/ . [Accessed: Feb-2022].